




Facing the oil well workover site, it integrates PLC acquisition, intelligent process control, on-site visual monitoring and edge cloud collaboration capabilities to realize the operation process management and control of pipe lifting, bottom exploration, salvage, sand washing, plug drilling and casing milling. The Pad...
Talk directly to an engineer · 48-hour first response
Submit your operation parameters and get a configuration proposal from our engineers within 48 hours — only 6 form fields, enterprise mailbox routing supported