SOLUTION DETAIL

Drilling Parameters Solution

Home›Solutions›Drilling Parameters Solution
01

Scenario & Pain Points

Answers for buyers: "this is exactly my wellsite"

Mixed gauge brands and scattered single-purpose meters make multi-rig data impossible to compare; dispatch still asks wellsite by phone.

  • Scattered gauges force constant scanning — key values get missed
  • Inconsistent readings make multi-rig comparison and archiving impossible
  • Complex wellsite wiring drives up installation and maintenance cost
  • No automatic remote feed — dispatch relies on manual logbooks
Drilling Parameters
02

Solution Composition · Product Mix

Answers for buyers: "what does this solution consist of"

Each product is labeled with its role in the system; click any product to jump to its detail page — solutions and products are entry points for each other.

03

Key Specifications & Certifications

Answers for buyers: "are the specs & compliance solid"
Key SpecsSpecification
ParametersDepth · ROP · hook load / WOB · standpipe pressure · torque · RPM · pump strokes · mud level
DisplayLED drill-floor display + doghouse gauges, dual position optional
AccuracyLoad ±1% F.S; centralized display with auto charts & curves
OutputRS485 / 4-20mA / CAN, remote & IoT platform ready
ProtectionIP65 · operating temp. -40 ℃ ~ +70 ℃
🛡️ ISO 9001 Quality System · Full-process QC
ISO 9001:full-process R&D, production & QC coverage
Factory:full-parameter calibration before shipment
Documents:bidding files ready, provided with inquiry
Request certificate copies & machine dossier →
04

Field Cases

Answers for buyers: "who has done similar projects"
Daqing · drilling crews

Fleet-wide gauge upgrade

Multi-parameter units + weight indicators installed in batch — unified readings, auto dispatch reports.

Changqing · workover fleet

Digital retrofit for aging rigs

Fast-line sheave assembly installs without rig modification; rope changes without downtime.

Xinjiang · bailing fleet

Swabbing control on trucks

Sheave depth / load systems on board — depth, load and level on one screen.

More case dossiers for your working conditions available on inquiry →

Get a configuration proposal & quote for this solutionTalk directly with engineers · first response within 48 hours · only 6 form fields
Get Proposal / Quote Try the Selector first →

No matching solution for your working conditions?

Submit your operation parameters and get a configuration proposal from our engineers within 48 hours — only 6 form fields, enterprise mailbox routing supported

Submit Your Case →