SOLUTION DETAIL

Anti-Collision Safety Solution

Home›Solutions›Anti-Collision Safety Solution
01

Scenario & Pain Points

Answers for buyers: "this is exactly my wellsite"

Block-to-crown collision remains one of the most severe accidents in drilling & workover. At night, in poor visibility or operator fatigue, human lookout alone is not fast enough.

  • No continuous block height / speed sensing — eyeball estimation only
  • Braking relies on manual action — long chain, missed window
  • Wrong Ex-zone instrument selection becomes a hazard itself
  • Mixed brands mean inconsistent alarm logic & maintenance
Anti-Collision Safety
02

Solution Composition · Product Mix

Answers for buyers: "what does this solution consist of"

Each product is labeled with its role in the system; click any product to jump to its detail page — solutions and products are entry points for each other.

03

Key Specifications & Certifications

Answers for buyers: "are the specs & compliance solid"
Key SpecsSpecification
Height Range0 – 28 m (customized to derrick height)
Accuracy±0.05 m; speed resolution 0.01 m/s
Alarm ResponseAudio-visual < 100 ms, linked braking < 500 ms
OutputRS485 / 4-20mA / CAN, PLC & remote platform ready
ProtectionIP66; operating temp. -40 ℃ ~ +70 ℃
🛡️ Ex-certified Models · Verifiable Certificates
ATEX / IECEx:Ex db IIB T4 certified models
Certificates:numbers verifiable online, quotable in bids
Regions:Middle East / Central Asia / Russian-speaking projects
Request certificate copies & machine dossier →
04

Field Cases

Answers for buyers: "who has done similar projects"
Xinjiang · drilling crews

200+ rigs retrofitted in batch

Linked with auto braking — three consecutive years of zero anti-collision accidents.

Middle East · export projects

ATEX models exported in batch

First-pass acceptance, 45-day delivery including on-site commissioning & training.

Bohai Bay · offshore platform

Anti-corrosion offshore models

Stable operation in salt fog; listed on the annual inspection no-disassembly list.

More case dossiers for your working conditions available on inquiry →

Get a configuration proposal & quote for this solutionTalk directly with engineers · first response within 48 hours · only 6 form fields
Get Proposal / Quote Try the Selector first →

No matching solution for your working conditions?

Submit your operation parameters and get a configuration proposal from our engineers within 48 hours — only 6 form fields, enterprise mailbox routing supported

Submit Your Case →