Home›Products›Integrated Safety Monitoring and Control›Rollover Prevention System
Rollover Prevention System

Rollover Prevention System

Real-time monitoring of inclination state data in the derrick area to prevent derrick tipping or equipment damage, with reliable inclination display, overrun alarm, interlocking control and anti-tipping execution functions.

✓ 48-hour first response✓ 1-year warranty · free technical repair✓ Genuine spares in stable supply

Product Introduction

Main functions:

1.Real-time monitoring: the LCD screen of the main control box displays the current derrick inclination in real time.

2. Over-limit alarm: When the inclination exceeds the limit, the audible and visual alarm will be automatically triggered to remind the operator.

3.Inclination monitoring: monitor the inclination status of the derrick in real time, and output interlocking signals when the inclination exceeds the limit.

4. Data record: alarm events and data records are automatically stored, and historical records can be queried.

5. U disk export: alarm events and data records support U disk export.

Specifications

Power supplyAC220V/DC24VRange± 90 °
Comprehensive accuracy≤ ± 0.1 °Temperature range-20 ℃ ~ + 60 ℃
Protection classIP65

Selection Guide

FunctionInclination angle alarmInterlock executionAudible and visual alarmDisplay the derrick inclination
Whether to default the functionYesOptionalYesYes
Tilt sensorExplosion-proof dual-axis tilt sensor
Sensor installationFixed type of derrick top/fixed type of rig chassis
Tilt sensor interfaceRS485/4-20mA
Installation methodDriller's station built-in or independent box hanging type
Display size7 inches


FAQ

Didn't find your question?

Talk directly to an engineer · 48-hour first response

Have a technical question about this device?Talk directly to an engineer · 48-hour first response
Talk to an engineer · Quote Select by my conditions →

No matching solution for your working conditions?

Submit your operation parameters and get a configuration proposal from our engineers within 48 hours — only 6 form fields, enterprise mailbox routing supported

Submit Your Case →